Keith D. Smith Concrete was placing and finishing a slab on grade for the pedestrian bridge at the Utz Facility in Hanover, PA. Related ArticlesTrade Center 44 CompletedExterior Slab Dermody9/11 Healing Field MemorialOrthopedic Associates of LancasterStone Grading at DermodyTST ImpressoSaw Cutting Martin’s PastryBaby Item DriveMatrix WarehouseLast Tilt Wall Panel Pour at Principio