Skip to Main Content

Year Completed: 2021
Location: York, PA

This warehouse project included foundation excavation and installation, placing and finishing of interior concrete and exterior sidewalks and other flatwork. The concrete package also included the prepping, placing, finishing, and full package installation and erection of 62 non insulated site cast 9 1/4” thick concrete tilt wall panels (57,512 sqft).

  • 2285 continuous footings
  • 69 column footings
  • 216,650 Sqft. interior slab on grade
  • 1,330 Sqft. slab on deck
  • 27,810 Sqft. dock aprons
  • 3,600 Sqft. dolly strips

Project Gallery